Industrial distribution · Invented example

Keep the Agreed Quote with the Order

A buyer agrees to a quote. Order entry receives a PDF, an email and a revised item list. They do not all describe the same order. Which version should the work follow?

This invented distributor example follows one handoff from a revised quote to a released order. Its rules, records and proposed tests are illustrative. The point is to make the agreement, the remaining checks and the authority to proceed visible together.


One request, two quotes

The first quote offers twelve units of item A for a requested delivery window. The buyer then asks for eight units of A and four of B. Sales issues revision two with a new item list, price and delivery plan.

An approval email arrives with revision one attached. At the same time, the price in revision two needs an internal exception, and fulfillment has not yet confirmed the new delivery plan.

In this example, releasing an order requires approval of the current quote by the buyer, approval of the pricing exception by the sales lead, and confirmation of the fulfillment plan by operations. These are three separate requirements. A customer email cannot satisfy all three.


Keep the gate with the revision

The quote record holds the current revision and preserves the earlier one. The buyer's approval points to the revision it actually covers. The pricing decision names the person authorized to make it, the affected items, the reason and any limits.

Receiving the old approval is an Event. Checking what it covers is a Task. Approval of the current revision remains an unmet Condition until its owner has reviewed suitable evidence. The pricing exception is a Decision under the authority chosen for this example.

The order's state records where the work stands. It does not replace those requirements or the evidence behind them. A single green status would hide too much if it meant only that someone had uploaded an email.

An AI assistant could help compare the item lists or draft a review note. That is a proposed use, not a capability demonstrated here. Its output would still need checking against the actual revisions and the authority to approve them.


Make the handoff carry the agreement

Once the three requirements are met, the handoff should identify the request, the approved quote revision, the agreed items and quantities, the price and the confirmed delivery plan. It should also carry the supporting approvals and any exception limits that matter to the receiving team.

The receiving person should be able to answer a concrete question: does the order I am about to enter describe the agreement that was approved? If the answer depends on finding someone who remembers which attachment won, the handoff is incomplete.

Preserving a readable quote helps. It does not, by itself, prove that the right order reached the destination system. The intended record and the saved result are separate evidence.


Read back the released order

For this proposed workflow, order entry records the destination order identifier and compares the saved items, quantities, price and delivery plan with the approved revision. The Event is that this particular order was created; the readback establishes what was actually saved.

If the receiving system times out, the result is unknown. A named owner checks the destination before submitting again. A missing response is not enough evidence to conclude that no order exists.

An automated handoff would need its own tested controls for revisions, authorization, duplicate submissions and recovery. A manual handoff would need a person to perform and record the checks. Writing the requirements down does not install either mechanism.


Treat a later change as new work

Suppose the buyer requests another quantity change after the order is released. The original approval still explains the original release. The new request needs its own record, an assessment of what has already happened downstream and review of the affected requirements.

The responsible people decide whether the change can be accepted and how to carry it through. The earlier approval does not silently expand to cover the new request.

This can be modeled as a Cycle within the order: a scoped round of requirements, work, recorded events and decisions, linked to the parent record. It preserves the reason for the change without pretending that a revised document undoes a pick, shipment or other completed action.


Test the handoff before relying on it

These are proposed acceptance cases, not reports of passed tests. With all three requirements met for revision two, the expected result is an order for revision two and a matching destination readback.

With only revision one's approval, the expected result is a held release with an identified owner for the missing current approval. With the buyer's approval but no internal pricing decision, the pricing requirement remains open. Neither case should appear ready just because an attachment exists.

An uncertain submission needs a reconciliation case. A later quantity change needs a case that starts from the actual downstream state. Test the mechanism that is implemented, including how it fails and how people recover; a proposed checklist is not evidence that a system prevents an action.

The method in How We Verify separates these expected results from executed tests, release evidence, operator acceptance and measured business results.


Start with one handoff

The useful first boundary here is the transfer from an agreed quote to a verified order. Map the records, requirements, owners and destination before choosing which parts to configure, automate or keep under human review.

The five-concept framework supplies the vocabulary. A systems assessment can define the implementation boundary and the cases it needs to pass. To discuss one handoff in your operation, start with the workflow and its owner.