Every operation is five things.
Subject (what the work is). Conditions (what must be true to advance). Tasks (the actual work). Events (the lifecycle facts). Decisions (the human judgments at gates). Plus a sub-pattern called Cycles for in-flow loops: draws, modifications, change orders, repair claims, returns.
That’s the whole thing. The same questions can be asked of a project, a customer order, a production run or a loan. The vocabulary changes with the operation. Click any concept below to explore it.
Subject
What the loan IS. Borrower, property, terms, parties (broker, LO, guarantor, investor, servicer, escrow, title, GC), the program it falls under, the lifecycle state it's currently in.
The model calls for versioned values with timestamps and sources, so a later change does not obscure the terms used for an earlier Decision.
Conditions
What must be TRUE about the Subject for the loan to advance. The atomic unit of loan progression. Title cleared. Income docs in. LC approval recorded. OFAC checked. Reserves verified.
In this model, Conditions can be grouped into four categories: Document (requires reviewed evidence), Check (verify a value), Decision-anchored (waits for a Decision), Event-anchored (waits for an Event).
Tasks
The actual work. Order title. Run pre-approval. Draft disclosures. Pull the BPO. Verify the rent roll.
Tasks perform work toward Conditions; some, such as a status update, can stand alone. Specify an accountable owner, the expected output and any due date.
Events
Lifecycle facts that happen TO the loan. Wire sent. Draw disbursed. Payment received. Modification executed. Default filed. Some you cause; some happen to you (investor pull-back, escrow rejection, payment receipt).
Preserve Events with their times and sources. Reconstructing a past state also requires the relevant Subject, Condition, Decision and evidence history.
Decisions
The human judgments at gates. LC approval. Exception grant. Pricing call. Kickback. Workout call. The discretionary moments where someone has to decide.
Link each judgment to its decider, authority, rationale, time and reviewed inputs. Preserve later changes and the relationship to the earlier call.
Cycles
In-loan sub-loops with their own 5 concepts. Construction draws. Modifications. Workouts. Re-disclosures. Adjustable-rate resets. Annual escrow analyses.
A Cycle scopes the same five concepts to part of the parent loan. Each draw has its own Conditions, Tasks, Events and Decisions, linked to that loan and the inputs under review.
The explorer above uses a hypothetical loan as its worked example, because lending is where the framework was first tested. The table below shows the same concepts in other industries.
A shared vocabulary for examining the work.
Things being acted on. States those things have to reach. Actions that move them. Facts that get recorded. Judgments humans make at gates. Loops inside the larger flow.
The concepts earn their keep in the lines they draw. A received document is evidence; the requirement it supports is met only once someone has reviewed it. A Task is work someone means to do; an Event records that something happened. When a gate needs judgment, the Condition is the gate and the Decision is the judgment that clears it, with its evidence and the authority behind it. Granting an exception is a Decision too: it overrides a Condition, so it needs a named decider and a reason. A revision or a repeat that runs its own requirements, work and judgments is a Cycle, the same five concepts at a smaller scale.
What changes by vertical is the names, the rules, and the regulatory overlays. What stays the same is the structure. Most operating businesses, when you walk in the door, are running on accidental taxonomy. Departments use different words for the same thing. Systems model the same entity three different ways. Decisions get made in Slack threads nobody can find six weeks later.
The five concepts (plus Cycles) make the implicit explicit. Naming the shape is what lets software be coherent, automation be safe, AI tools be useful, and humans across departments articulate the same problem with the same vocabulary. Domain-Driven Design calls this ubiquitous language. Lean calls it shop-floor terminology. The principle is older than software. The application to mid-market specialty operations is what’s new.
Naming the shape doesn’t enforce anything by itself. A requirement holds only when a system checks it or a named person does. Implementation work showed us that a useful step is writing down, for each requirement, what done looks like and how it will be checked.
Same five concepts. Vertical-specific vocabulary.
Same architectural moves work everywhere.
| Concept | Lending | Construction trades | Specialty distribution | Manufacturing |
|---|---|---|---|---|
| Subject | Loan | Job / project | Order / customer account | Production run / SKU |
| Conditions | Conditions library (appraisal, title, KYC) | Permits, insurance certs, change-order approvals | Credit limit, payment terms, inventory | BOM verified, QC passed, materials sourced |
| Tasks | Underwriting, doc collection, closing prep | Crew dispatch, materials, install, sign-off | Order entry, pick/pack, freight | Setup, production, QC, packaging |
| Events | Disclosures signed, wire sent, funding, payoff | Permit pulled, milestone done, inspection passed | Order shipped, delivered, payment received | Run started, completed, shipped, returned |
| Decisions | LC approval, exception grants, pricing | Bid acceptance, change-order approval, disputes | Credit decisions, allocation, exceptions | Change orders, vendor selection, QC overrides |
| Cycles | Draws, modifications, workouts | Punch lists, warranty claims, repair returns | Returns, restocks, recurring orders | Reworks, recalls, custom revisions |
The same architectural moves — conditions library, communication routing, decision capture, workflow orchestration, operations architecture — install at any of these. The vocabulary translates. The pattern doesn’t change.
The framework above uses abstract primitive names because those are the methodology layer.
In a build, the same concepts become workstreams with plainer names:
| Framework concept | Build workstream |
|---|---|
| Subject + cross-system view | System connections |
| Conditions | Requirements |
| Tasks + Cycles | Workflow |
| Tasks + Events | Communication |
| Decisions | Decision capture |
Same architecture, plainer vocabulary. The framework concepts are for reading and reasoning. The workstream names are for scoping a build, and they are possible components, not a package. Explore build and implementation →
The full framework is open-source on GitHub under Creative Commons CC-BY-4.0.
Use it commercially. Adapt it. Reference it. The published version is written for lending, where the framework was first tested. The table above shows the same concepts in other industries.
Four steps. Start with one workflow.
1. Map your existing systems to the five concepts
Where does Subject live — CRM, ERP, LOS, project-management, both? How are Conditions tracked: native to your operational system, Excel checklists, custom CRM objects? Are Decisions captured systematically or only verbally? Are Cycles modeled or improvised per instance?
2. Identify the gaps
A common pattern: strong Subject + Conditions (because vendor systems usually handle the obvious entities), medium Tasks + Events, weak Decisions, weakest Cycles. Decisions and Cycles are often the highest-leverage areas to invest in.
3. Identify the cross-cutting concerns
System-of-record clarity. Temporal constraints (regulatory, contractual, seasonal). Communication routing. Governance derivation. The places where multi-system complexity surfaces.
4. Design improvements layer by layer
Don’t try to rebuild everything. Use the framework to identify the highest-leverage gap, fix it, move to the next. Diagnostic first, architecture second. Per the modular addition piece at the Wade School: add a room, don’t rebuild the house.
Useful when:
- Multiple systems hold pieces of the same operational state (CRM + operating system + doc storage + verification)
- Workflow gaps surface (manual handoffs, ad-hoc decisions, undocumented exceptions)
- Compliance or audit proof is needed but currently informal
- Stakeholders need a shared mental model that isn’t tied to a vendor’s object names
- Lifecycle complexity is increasing (multi-channel, multi-product, modifications, returns)
- AI tools are being evaluated and the data substrate underneath them is unstructured
A single operational system handles everything end-to-end well, volume is low enough that manual coordination works, or the operation has a single product type with no lifecycle complexity.
Most operators should not build their own operational system from scratch.
For the majority, the right answer is vendor-system adaptation. The moat in mid-market specialty operations is regulatory, operational, and relationship-based, not software.
For the small set with the operator depth, capital, and runway to build (typically de novo operators, well-funded entrants, operators coming off a forced platform replacement, or capital allocators with a portfolio of operating businesses), the wrong starting point is a blank page. The 5-concept framework and the open-source architecture sketch on GitHub exist so build-path operators don’t reinvent the operational taxonomy from scratch.
If you’re a lender trying to figure out which side of that line you’re on, the Encompass vs Nexys vs Build comparison walks through six concrete LOS options with the decision criteria laid out. The free Stack Audit Tool gives lenders a starting answer in about five minutes. For other industries, start with the four steps above.
The framework is universal. The vocabulary translates.
For the lending application in depth, in lender vocabulary, see For Lenders. The framework itself applies beyond lending.
Wade Intel helps you assess, implement and support the work.
Systems assessment ($5,000–$15,000, fixed scope). Build and implementation (priced after assessment). Ongoing technology leadership (from $7,500/month). A data sprint can address a narrower question from an agreed export.